Before any renovation or demolition project, asbestos testing isn’t optional. It’s the responsible first step. All Sides team handles inspection and sampling for both residential and commercial properties across Texas.

Asbestos testing involves a physical inspection of a building to look for materials that may contain asbestos, followed by sample collection and accredited lab analysis to confirm the presence and condition.
Buildings constructed before 1980 are particularly likely to contain asbestos in floor tiles, ceiling materials, pipe insulation, roofing, and joint compound. The material isn’t dangerous when undisturbed, but the moment it’s cut, drilled, or removed without proper handling, it becomes a serious airborne health hazard.

We find out the property’s age, construction type, and planned scope of work. This helps us prioritize which areas and materials are most likely to contain asbestos and design a sampling plan accordingly

We visually inspect the building and collect bulk material samples from suspect areas using proper collection procedures. All samples are handled and packaged under regulatory protocols to prevent fiber release during collection.

Samples are analyzed by a certified laboratory using polarized light microscopy, the standard method for asbestos identification. Results identify the type of asbestos present and the percentage of content in each sample.

You receive a written asbestos survey report documenting all samples, lab results, and recommendations. If asbestos-containing materials are found, we’ll outline what needs to be abated, managed in place, or addressed before your project begins.


Most renovation and demolition permits in Texas require documentation that asbestos-containing materials have been identified and addressed before work begins. Getting caught mid-project without a survey can result in work stoppages, regulatory fines, and significant liability for both contractors and property owners.
Testing before the project starts is always faster and less expensive than dealing with the fallout afterward.





For commercial buildings, TCEQ regulations require an asbestos survey before any renovation or demolition that may disturb asbestos-containing materials. For residential properties, it isn’t always legally required, but it’s strongly recommended for any pre-1985 home before work that disturbs building materials.
No, asbestos cannot be identified visually. Many common building materials look identical whether or not they contain asbestos. The only reliable way to confirm presence is through proper sampling and accredited laboratory analysis.
Finding asbestos isn’t automatically a crisis. Asbestos in good condition that won’t be disturbed can often be managed in place. If it needs to be removed for renovation, demolition, or due to deterioration, we can manage the licensed abatement process as well.
The number of samples depends on the building’s size, the number of suspect materials, and the scope of planned work. We’ll give you a clear sampling scope before we start, so there are no surprises on the back end.
The on-site inspection and sampling typically take a few hours. Lab results are usually back within 3–5 business days. If you’re working against a construction deadline, rush turnaround may be available.
Customer
A tenant complained of headaches and a strange smell that no one else noticed. All Sides Environmental’s IAQ testing pinpointed elevated VOCs from new flooring adhesive, not mold or other previously considered issues. We fixed it fast, and the tenant stayed. Their expertise saved the relationship.

Customer
Our Phase I flagged a recognized environmental condition on a Houston-area tract. All Sides Environmental decoded complex Phase II findings into plain language, explaining exactly what contamination levels meant for our plans. This clarity helped us confidently decide whether to proceed, that’s rare expertise in this field.

Customer
Renovating a late-70s facility wing, our contractor required asbestos clearance. Dean’s team sampled floor tiles, ceiling material, and pipe insulation on short notice, delivering a report in four days, and flagged an area we’d overlooked. Their thoroughness saved us from a costly mid-renovation surprise.

Customer
Two companies gave us a clean bill of health, but something felt off. The All Sides team dug deeper and inspected longer. They used tools that looked inside the walls near our HVAC closet and found a hidden mold colony. All Sides oversaw remediation end-to-end, and we tested clean and received our clearance certificate within a week.

Customer
Three weeks from closing on a Katy strip mall, our lender suddenly required a Phase I ESA. All Sides scheduled us in two days, was on-site by Thursday, and delivered the report before our deadline. The lender accepted it without question, and I’ve since referred them twice.